top of page

Janor Street, Riverside Launceston

Enlisted by the West Tamar council to complete this section of road reconstruction.

 

This 45lm section of the road had failed due to water issues.

 

A full box out of the road was required and undertaken with a full rock blanket installed and sub soil drainage connected which was then directed into nearby stormwater pits.

 

The road was then back filled and capped with an asphalt layer.

Dark-Background
bottom of page